<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Timeline of Development | Military Equipment Projects in Reitzmag]]></title><description><![CDATA[<p dir="auto">(under development)</p>
]]></description><link>http://165.22.228.80:80/topic/833/timeline-of-development-military-equipment-projects-in-reitzmag</link><generator>RSS for Node</generator><lastBuildDate>Sat, 04 Apr 2026 12:05:26 GMT</lastBuildDate><atom:link href="http://165.22.228.80:80/topic/833.rss" rel="self" type="application/rss+xml"/><pubDate>Mon, 22 Feb 2021 04:43:21 GMT</pubDate><ttl>60</ttl><item><title><![CDATA[Reply to Timeline of Development | Military Equipment Projects in Reitzmag on Sun, 18 Apr 2021 04:33:28 GMT]]></title><description><![CDATA[<h1><a class="anchor-offset" name="strong-project-thunderbolt-ii-strong"></a><strong>PROJECT THUNDERBOLT II</strong></h1>
<hr />
<h3><a class="anchor-offset" name="strong-specifications-strong"></a><strong>Specifications:</strong></h3>
<table class="table table-bordered table-striped">
<thead>
<tr>
<th>Target Value</th>
<th>Actual Value</th>
</tr>
</thead>
<tbody>
<tr>
<td>Launch Platform</td>
<td colspan="2">Ship, Submarine, Aircraft, MLRS</td>
</tr>
<tr>
<td>Maximum speed</td>
<td colspan="2">Mach 5+</td>
</tr>
<tr>
<td>Operational Range</td>
<td colspan="2">1,000 km (620 mi)</td>
</tr>
<tr>
<td>RCS</td>
<td colspan="2">0.001 m^2 or lower</td>
</tr>
</tbody>
</table>
<hr />
<h3><a class="anchor-offset" name="strong-development-timeline-strong"></a><strong>Development Timeline:</strong></h3>
<p dir="auto"><strong>November 4 2020</strong> - Design Phase Begins<br />
<strong>January 6 2021</strong> - <a href="https://i.pinimg.com/originals/4b/1a/f9/4b1af9c75b583aa8729dc49f4557617e.jpg" rel="nofollow ugc">First Design</a> Made<br />
<strong>January 10 2021</strong> - First Wind Tunnel Testing<br />
<strong>January 17 2021</strong> - Second Wind Tunnel Testing<br />
<strong>January 24 2021</strong> - Scale Model Construction<br />
<strong>February 12 2021</strong> - Scale Model Launch Test<br />
<strong>February 25 2021</strong> - Scale Model Second Launch Test<br />
<strong>March 10 2021</strong> - Design adjustments made, size specifications finalized<br />
<strong>March 29 2021</strong> - First Prototype built<br />
<strong>April 7 2021</strong> - Wind Tunnel Test of First Prototype</p>
]]></description><link>http://165.22.228.80:80/post/8865</link><guid isPermaLink="true">http://165.22.228.80:80/post/8865</guid><dc:creator><![CDATA[Kingdom of Reitzmag]]></dc:creator><pubDate>Sun, 18 Apr 2021 04:33:28 GMT</pubDate></item><item><title><![CDATA[Reply to Timeline of Development | Military Equipment Projects in Reitzmag on Thu, 16 Sep 2021 06:50:31 GMT]]></title><description><![CDATA[<h1><a class="anchor-offset" name="strong-project-eagle-strong"></a><strong>PROJECT EAGLE</strong></h1>
<hr />
<h3><a class="anchor-offset" name="strong-specifications-strong"></a><strong>Specifications:</strong></h3>
<table class="table table-bordered table-striped">
<thead>
<tr>
<th>Target Value</th>
<th>Actual Value</th>
</tr>
</thead>
<tbody>
<tr>
<td>Crew Capacity</td>
<td colspan="2">1 or 2</td>
</tr>
<tr>
<td>Maximum speed</td>
<td colspan="2">Mach 2.15+</td>
</tr>
<tr>
<td>Range</td>
<td colspan="2">3,800 km (2,400 mi, 1,750 nmi)</td>
</tr>
<tr>
<td>Combat range</td>
<td colspan="2">1,500 km (932 mi, 810 nmi)</td>
</tr>
<tr>
<td>Ferry range</td>
<td colspan="2">5,000 km (3,107 mi, 2,700 nmi)</td>
</tr>
<tr>
<td>Service ceiling</td>
<td colspan="2">2,000 km (1,200 mi, 1,100 nmi)</td>
</tr>
<tr>
<td>Rate of climb</td>
<td colspan="2">300 m/s (59,000 ft/min)</td>
</tr>
<tr>
<td>RCS</td>
<td colspan="2">0.001 m^2 or lower</td>
</tr>
<tr>
<td>Gun</td>
<td colspan="2">GSh-23</td>
</tr>
<tr>
<td>External Hardpoints</td>
<td colspan="2">6</td>
</tr>
<tr>
<td>Internal Bay Capacity</td>
<td colspan="2">8</td>
</tr>
</tbody>
</table>
<hr />
<h3><a class="anchor-offset" name="strong-development-timeline-strong"></a><strong>Development Timeline:</strong></h3>
<p dir="auto"><strong>February 10 2021</strong> - Design Phase Begins<br />
<strong>February 20 2021</strong> - <a href="https://upload.wikimedia.org/wikipedia/commons/thumb/2/29/HAL_AMCA.png/320px-HAL_AMCA.png" rel="nofollow ugc">First Design</a> Made<br />
<strong>March 1 2021</strong> - Wind Tunnel Testing of First Design<br />
<strong>March 4 2021</strong> - <a href="https://www.planobrazil.com/wp-content/uploads/2017/02/AMCA.png" rel="nofollow ugc">Second Design</a> Made<br />
<strong>March 18 2021</strong> - Wind Tunnel Testing of Second Design<br />
<strong>March 26 2021</strong> - Scaled-up model made<br />
<strong>March 30 2021</strong> - Scaled-up model Wind Tunnel test<br />
<strong>April  5 2021</strong> - Minor adjustments to design<br />
<strong>June 3 2021</strong> - <a href="https://upload.wikimedia.org/wikipedia/commons/9/90/AMCA_render_by_Satwik_Sadhukhan.jpg" rel="nofollow ugc">Final Design</a><br />
<strong>July 15 2021</strong> - Prototype construction begins</p>
]]></description><link>http://165.22.228.80:80/post/8863</link><guid isPermaLink="true">http://165.22.228.80:80/post/8863</guid><dc:creator><![CDATA[Kingdom of Reitzmag]]></dc:creator><pubDate>Thu, 16 Sep 2021 06:50:31 GMT</pubDate></item></channel></rss>